Chieftec A-80 Series 650W Non-Modular Power Supply Review




/ 10 years ago

« Previous Page

Next Page »

Test Procedure


At eTeknix we take the power supply testing procedure very seriously and have invested a lot of resources into acquiring the appropriate testing equipment. For all power supply reviews we test the power supplies with dedicated power supply testing equipment. This means we are able to get the most accurate results from our testing as opposed to using software benchmarks (such as OCCT) or multi-meter readouts which are broadly inaccurate.

sunmoon_5500_ate

Our test machinery is as follows:

  • Sunmoon SM-5500ATE Active Load Tester (1200W rated)
  • Sunmoon SM-268 Active Load Tester (450W rated)
  • GW Instek GPM-8212 Digital Power Meter
  • Stingray DS1M12 USB Oscilloscope
  • Voltcraft DT-10L laser tachometer

The eTeknix test procedure involves:

  • Testing each power supply at 20/40/60/80/100% load (with balanced load across all rails) and measuring PFC (power factor correction), efficiency (actual power divided by power “pulled at the wall”) and voltage regulation (deviance from expected voltages of 3.3/5/12 on the main rails).
  • Measuring ripple with an oscilloscope at 20/40/60/80/100% load.
  • Measuring fan speed after a stabilisation period of five minutes at each load scenario using the Voltcraft DT-10L laser tachometer and a reflective strip on the fan.
  • Testing each power supply’s OPP (Over Power Protection) mechanism and seeing how many watts each power supply can deliver before shutting down

Other things to consider are that

  • We recognise that a single yellow 12 volt cable can provide only 6 Amps before overheating (which corrupts voltage regulation and efficiency) and so we used an adequate number of cables for each power supply to ensure there is not efficiency loss from poor cables selection
  • Our Sunmoon SM-5500ATE power supply tester is not capable of testing more than 300W on each of the 12 volt rails so where a power supply provides more than 300W on a 12 volt rail that power is distributed over multiple 12 volt rails on the load tester. For example a power supply with one 12 volt rail supplying 750 watts would be spread equally over three 12 volt rails on the load tester, a power supply with two 450W 12v rails would be spread over four 12v rails on the load tester, two 225W 12v rails for each of the 12v rails on the unit.
  • We use the same time scale and horizontal millivolt scale on our oscilloscope for all ripple tests, that is a 20ms T/DIV (horizontal) and a 0.02 V/DIV (vertical) meaning the scale is from -80mV to +80mV, ATX spec dictates that the 12v rail must fall within 150mv of ripple and the 3.3/5 within 50mv so that scale allows us to include both 150 and 50mV peaks. (Some older PSU reviews use different scales which were later ditched as the visual representation they give is inadequate, in these reviews written measurements are provided only).
  • Deviance is the terminology used to represent the way voltages diverge from the expected values

« Previous Page

Next Page »


Topics: , , , , , , ,

Support eTeknix.com

By supporting eTeknix, you help us grow and continue to bring you the latest newsreviews, and competitions. Follow us on FacebookTwitter and Instagram to keep up with the latest technology news, reviews and more. Share your favourite articles, chat with the team and more. Also check out eTeknix YouTube, where you'll find our latest video reviews, event coverage and features in 4K!

Looking for more exciting features on the latest technology? Check out our What We Know So Far section or our Fun Reads for some interesting original features.

eTeknix Facebook eTeknix Twitter eTeknix Instagram eTeknix Instagram
  • Be Social With eTeknix

    Facebook Twitter YouTube Instagram Reddit RSS Discord Patreon TikTok Twitch
  • Features


Send this to a friend
})