It has now been all but confirmed that Nvidia’s Kepler 28nm graphics processing chips will start production this year for definite. Its producer TSMC has made plans to start production of the new 28nm architecture but the final end products, graphics cards, will not be hitting the shelves until Q2 2012 at the earliest. Which leaves the Kepler based graphics cards due to arrive at a similar time to Ivy Bridge which is perfect for Intel since Ivy Bridge will support PCI-E 3.0 and the cards are going to be PCI-E 3.0.
In the grand scheme of things this is still quite disappointing for Nvidia, this puts them a quarter behind their long term plan on releasing new GPU architecture (see the roadmap image below). The competition from AMD will also be problematic, AMD expects to be ready to launch by the end of this year with some touting now as early as mid-late September and if the AMD cards are hugely successful we could see Nvidia miss out because of poor timing.
According to a new report, the GeForce RTX 5090 GPU will be very expensive. It…
A new AMD processor in the form of an engineering model has been leaked in…
SK Hynix has claimed to be the first company to mass-produce 321-layer NAND memory chips.…
SOUNDS GREAT – Full stereo sound (12W peak power) gives your setup a booming audio…
Special Edition Yoshi design Ergonomic controller shape with Nintendo Switch button layout Detachable 10ft (3m)…
Fluid Motion: These flight rudder pedals are smooth and accurate that enable precise control over…