News

NASA Wants To Return To The Moon Before The End Of 2019

NASA Plans To Return To The Moon

With all of the private space projects currently underway it is easy to forget that NASA does still exist. Admittedly, the company has been very much in the backseat of rocketry for the last 15 years. Well, specifically after the Shuttle Columbia broke up on re-entry.

In a report via CNET, however, NASA has revealed plans to return to the surface of the Moon before the end of 2019.

A Lofty Goal

We should at this point clarify what NASA mean by this. There is absolutely no indication to suggest that the space agency means to physically put ‘man’ on the Moon again. Last November, however, the space agency did reveal two key factors. Firstly that they were in discussions with 9 contractors over the design of a new rocket system, and secondly that they did plan to return to the Moon “sooner than we might think”.

So, what does ‘returning to the Moon’ actually mean? Well, the likelihood is that NASA wants to get more rovers and perhaps even test a landing craft.

One Small Step

It has been over 40 years now since we last walked upon the Moon and while these might represent babysteps, it seems clear that NASA wants to revisit it again. There has been more than a little discussion of the creation of a base on the Moon. Specifically, one that could act as a ‘gateway’ to allow for far more significant exploration of our solar system.

With something hopefully happening before the end of the year though, this is certainly going to be interesting!

What do you think? – Let us know in the comments!

Mike Sanders

Disqus Comments Loading...

Recent Posts

Nvidia’s GeForce RTX 5090 Possible Price Revealed

According to a new report, the GeForce RTX 5090 GPU will be very expensive. It…

4 hours ago

AMD Krackan Processor with 6 Zen 5 and Zen 5c Cores for Budget AI Laptops Leaked

A new AMD processor in the form of an engineering model has been leaked in…

5 hours ago

SK Hynix Begins Production of First 321-Layer NAND Chips

SK Hynix has claimed to be the first company to mass-produce 321-layer NAND memory chips.…

5 hours ago

Trust Gaming GXT 609 Zoxa 2.0 PC Speakers

SOUNDS GREAT – Full stereo sound (12W peak power) gives your setup a booming audio…

9 hours ago

PowerA Wired Controller for Nintendo Switch

Special Edition Yoshi design Ergonomic controller shape with Nintendo Switch button layout Detachable 10ft (3m)…

9 hours ago

Logitech G Saitek PRO Flight Rudder Pedals

Fluid Motion: These flight rudder pedals are smooth and accurate that enable precise control over…

9 hours ago