News

Worlds Biggest Nuclear Power Plant Given The OK To Switch On

World Biggest Nuclear Power Plant

Generating power for the future is definitely a serious matter. It, therefore, might surprise you that the world biggest power plant has, since it’s completion nearly 7 years ago, still not been turned on. The plant, however, located in Kashiwazaki-kaniwa in Japan has finally been given the green light to switch on.

Now that I’ve given the location away, the mystery may not be so difficult to solve anymore. Following the Nuclear disaster at the Fukushima Nuclear Power plant, concerns were raised at the safe implementation of another. In fairness, not an entirely unreasonable point.

In a report via FoxNews, however, TEPCO, the Japanese Nuclear safety ‘ombudsmen’ has given the plant the go-ahead. Once activated it will be the largest Nuclear Power Plant ever.

The announcement has been made following many additional safety features being implemented at the plant. There are, however, still concerns. Particularly given the large population which live in close proximity to the plant.

If I can just take us a brief detour, Nuclear Power Plants, generally speaking, have one major common feature. They have a large body of water very close. Why? because it is this water which cools the core and generates electricity. Having no water is bad, very bad. With no water, the nuclear material in the core heats so intensely that it literally melts the core. Hence the expression a ‘melt-down’. Now, if this isn’t bad enough, should that material then come into contact with water, you have whats known as a thermonuclear explosion which is incredibly worse. This I might add was fortunately avoided at Fukushima, however, was a very real possibility at Chernobyl which was only narrowly averted and at the cost of a lot of lives.

Safety Features Added

Therefore, since Fukushima, TEPCO has invested over $6 billion into this new plant in an effort to prevent any reoccurrences. This includes a 50-foot seawall and a reservoir next to the plant holding 22,000 tons of water.

Despite this, there are concerns from some officials and particularly locals. Some feel that the opening of the plant is simply an effort to begin recovering lost money from Fukushima and the additional safety features implemented. In addition, it’s hard to overlook recent cyber-attacks specifically targeting power plants. In addition, critics have also identified a possible flaw with the sea-wall. Specifically that if an earthquake occurs, it could compromise its strength. This would leave the plant vulnerable to a tsunami similar to that which occurred at the Fukushima plant.

The bottom line, however, is that we need (as a world) more power. Unfortunately, like it or not, I feel that nuclear is the best solution we have at the moment. Despite its frankly terrifying potential.

The official ‘firing up’ is not expected to happen until Spring 2019. It will, in addition, take a several more years before the plant is fully active.

What do you think? Is this safe enough to operate now? What is your answer to a long-term term energy solution? Does the scale of the plant impress you? – Let us know in the comments!

 

Mike Sanders

Disqus Comments Loading...

Recent Posts

SK hynix Starts Mass Production of World’s First 321-High NAND

SK Hynix has once again pushed the boundaries of semiconductor technology, announcing today the mass…

8 mins ago

Sharkoon Launches OfficePal C40 and OfficePal C40M Chairs

Sharkoon, a well-known name in PC peripherals and gaming accessories, has expanded its office furniture…

36 mins ago

Google Must Sell Chrome and, Perhaps, Android, for the US Department of Justice

In a motion filed in U.S. District Court in Washington, D.C. on Wednesday, November 19,…

1 hour ago

PHILIPS Evnia 27M2C5501 180Hz QHD FreeSync Gaming Monitor Review

Philips is well known for its monitors, but its Evnia series stands as the jewel…

3 hours ago

MSI Introduces New NVIDIA MGX Servers, Featuring Intel Xeon 6 and New Server Boards

Alongside AMD servers, MSI showcased its NVIDIA MGX AI servers and Intel Xeon 6 solutions…

18 hours ago

Intel’s Next Generation of Accelerators Will Be Called Jaguar Shores

Intel has its Gaudi 2 accelerators available, and Gaudi 3 will be available soon. But…

20 hours ago