✨ We've just launched our NEW website design!

Learn More Here
News

Latest Akasa Chassis & Accessories at Target Open Day

Akasa chassis

Akasa makes some of the nicest fan-less chassis on the market today, and while they didn’t have any that were entirely new, they did have their latest models out on display. They do look pretty much the same as the old models to those with an untrained eye, but the Skylake models pictured below are actually a little bit longer than they used to be. This is to allow more heat dissipation through the chassis to manage heat spikes from turbo-boost on Skylake CPUs. It’s a minor change, but a vital one.

dsc_0569

dsc_0570

Another new product range from Akasa is the Venom mouse pad range, obviously not the biggest innovation in the world, but the quality on them is great, and they come in sizes up to 1-meter, so they’re perfect for those who love a large gaming surface for low-DPI mouse action.

dsc_0561

dsc_0562

Their usual range of lighting, card readers and even a mini fan for those warm days in the office.

dsc_0563

Their Type-C to HDMI and power delivery adapter with extra USB 3.0 Type-A Port, not the catchiest product name in the world, but it leaves nothing to the imagination on how handy this unit can be for those who seek connectivity.

dsc_0564

Compatibility problems are even less of an issue thanks to their comprehensive range of USB cables.

dsc_0565

Finally, their smallest yet most interesting product, a passive-cooled aluminium Raspberry Pi chassis. There are a lot of these cases on the market, but they’re often cheap and plastic, whereas this is a much sleeker solution for those who want great build quality.

dsc_0567

 

Peter Donnell

As a child in my 40's, I spend my day combining my love of music and movies with a life-long passion for gaming, from arcade classics and retro consoles to the latest high-end PC and console games. So it's no wonder I write about tech and test the latest hardware while I enjoy my hobbies!

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Close

Adblock Detected

Please consider supporting us by disabling your ad blocker!   eTeknix prides itself on supplying the most accurate and informative PC and tech related news and reviews and this is made possible by advertisements but be rest assured that we will never serve pop ups, self playing audio ads or any form of ad that tracks your information as your data security is as important to us as it is to you.   If you want to help support us further you can over on our Patreon!   Thank you for visiting eTeknix